
The track begins after months of paperwork
Max, the son of member Peter Brown (holding the peg) drives the first peg marking out the walkway.
After consultation with DOC it has been decided to build a loop track first and continue with the main track up the Brunswick Road valley once the loop track has opened.
10th February 2006
Another day installing substantial marker poles for the loop track.

Regular Saturday Morning working bees are being held to form the track.
4th March 2006
25th March 2006
8th April 2006
22nd April 2006